8 Jul 2025
Teraloop celebrates 18 months of customer operation
Correcting frequency and voltage for industrial consumers

Twenty-four seven for one year!
A producer of fresh dairy products located in the Azores, Portugal, suffers from numerous voltage sags, which interrupt production. The dairy factory has a peak power demand of 2.2MW, which is 15% of the consumption of the island.
The Teraloop flywheel system was installed to perform voltage control and to correct frequency deviations.