Please rotate your screen
8 Jul 2025

Teraloop celebrates 18 months of customer operation

Correcting frequency and voltage for industrial consumers

back to news overview
Terceira,Azores,News.png

Twenty-four seven for one year!

A producer of fresh dairy products located in the Azores, Portugal, suffers from numerous voltage sags, which interrupt production. The dairy factory has a peak power demand of 2.2MW, which is 15% of the consumption of the island.

The Teraloop flywheel system was installed to perform voltage control and to correct frequency deviations.